A platform for research: civil engineering, architecture and urbanism
Concrete buttress Ambursen-type dam, 268 ft long; max height 70 ft; summary of concrete control tests.
Concrete buttress Ambursen-type dam, 268 ft long; max height 70 ft; summary of concrete control tests.
Construction of thief valley dam
Reclamation Era
Betts, C.A. (author)
Reclamation Era ; 23
1932
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1946
Detecting fire 'thief' prime security concern
Tema Archive | 1977
|"Stealing" Water with the Water Thief
British Library Online Contents | 1999
|