A platform for research: civil engineering, architecture and urbanism
Winter construction provides work relief
Flexible steam system made up of two self-sufficient units which could be connected to draw steam from three boilers in event of extremely cold weather, used in constructing grade-separation bridge 2 mi southeast of Pontiac; included in substructure were two counterfort abutments and three skeleton piers; superstructure is of steel deck-girder type over 159 ft long.
Winter construction provides work relief
Flexible steam system made up of two self-sufficient units which could be connected to draw steam from three boilers in event of extremely cold weather, used in constructing grade-separation bridge 2 mi southeast of Pontiac; included in substructure were two counterfort abutments and three skeleton piers; superstructure is of steel deck-girder type over 159 ft long.
Winter construction provides work relief
Construction Methods
Construction Methods ; 14
1932
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Relief project provides work and saves city's shores
Engineering Index Backfile | 1938
|Relief project provides work and saves city's shores
Engineering Index Backfile | 1938
|How highway work in upper Michigan provides unemployment relief
Engineering Index Backfile | 1933
|Unemployment relief spurs winter construction of highway bridges
Engineering Index Backfile | 1932
Croda's new emollient provides tack relief
British Library Online Contents | 2004