A platform for research: civil engineering, architecture and urbanism
Reconstructing Sandbar Ferry Bridge
Reconstruction of 60-yr old structure of Charleston and Western Carolina Railway Co, over Savannah River at Augusta, Ga, involved increasing number of spans from 4 to 6; max span 157 ft; strengthening old brick piers; piles added around old piers; provision made for navigation; precast pile bents and slabs for approach trestles.
Reconstructing Sandbar Ferry Bridge
Reconstruction of 60-yr old structure of Charleston and Western Carolina Railway Co, over Savannah River at Augusta, Ga, involved increasing number of spans from 4 to 6; max span 157 ft; strengthening old brick piers; piles added around old piers; provision made for navigation; precast pile bents and slabs for approach trestles.
Reconstructing Sandbar Ferry Bridge
Civ Eng (NY)
Willoughby, J.E. (author)
1932
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 2007
|Bloomington Ferry Pedestrian Bridge
British Library Online Contents | 2000