A platform for research: civil engineering, architecture and urbanism
Construction of highway bridge, 181 ft long, with main concrete arch span 114 ft long; use of temporary so-called inglis pipe-truss bridge to support centering and aid in construction of permanent concrete arch.
Construction of highway bridge, 181 ft long, with main concrete arch span 114 ft long; use of temporary so-called inglis pipe-truss bridge to support centering and aid in construction of permanent concrete arch.
Bara bridge reconstruction
Royal Engrs J
Henniker, M.C.A. (author)
1932
8 pages
2 Supp plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Dismantling inglis bridge at Bara
Engineering Index Backfile | 1933
|Inte bara förtätning: Den globala trädgården.
Online Contents | 2011
Bara kommers? - Står gotländska upplevelsedrömmar mot kvalitet?
Online Contents | 2006
|Arena: Bara bäst är bra. John Pawson intervjuad
Online Contents | 2003
|