Limitation of leakage through earth dam by means of cement grouting under normal water head
Grouting was conducted at normal water level of reservoir, during continuous operation of power station; dam of 15 m height has upstream slopes sealed with facing of concrete slabs; after 10 yr leakage of water and some settlement proved that seepage is increasing; after surveying, made by using radioisotopes, additional two rows of grouting holes at intervals of 1.4 m between rows and of holes, 4.0 m from each other in rows; after grouting was completed, no leakage or settlements were observed.
Limitation of leakage through earth dam by means of cement grouting under normal water head
Grouting was conducted at normal water level of reservoir, during continuous operation of power station; dam of 15 m height has upstream slopes sealed with facing of concrete slabs; after 10 yr leakage of water and some settlement proved that seepage is increasing; after surveying, made by using radioisotopes, additional two rows of grouting holes at intervals of 1.4 m between rows and of holes, 4.0 m from each other in rows; after grouting was completed, no leakage or settlements were observed.
Limitation of leakage through earth dam by means of cement grouting under normal water head
Etanchement d'un barrage en terre au moyen d'injections de ciment sous retenue normale de l'eau
Fanti, K. (author) / Kowalewski, J. (author) / Fiedler, K. (author) / Hermanowski, A. (author)
9th International Congress on Large Dams ; 1967 ; Turkey , Istanbul
1967
12 pages
Conference paper
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Grouting to prevent leakage around earth dam
Engineering Index Backfile | 1939
|Engineering Index Backfile | 1938
Engineering Index Backfile | 1938
Engineering Index Backfile | 1962
Engineering Index Backfile | 1950
|