A platform for research: civil engineering, architecture and urbanism
Soil cement was utilized at Bonny Reservoir, Merritt Dam, Cheney Dam, San Antonio Dam, "stair-step" method of construction to build up 6-in. layers of compacted soil-cement on San Antonio project, and Castaic Dam; development of soil-cement protection method after World War II; stair-step method is being used at 8 to 1 slope of working surface.
Soil cement was utilized at Bonny Reservoir, Merritt Dam, Cheney Dam, San Antonio Dam, "stair-step" method of construction to build up 6-in. layers of compacted soil-cement on San Antonio project, and Castaic Dam; development of soil-cement protection method after World War II; stair-step method is being used at 8 to 1 slope of working surface.
Cash saved on slope protection
Pac Bldr and Engr
Nicholson, L.P. (author)
1967
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cut to the quick: How Six Sigma saved Tubelines millions in slope stabilisation
British Library Online Contents | 2009
Cut to the quick - How Six Sigma saved Tubelines millions in slope stabilisation
Online Contents | 2009
European Patent Office | 2022
|