Construction of Plover Cove Dams
Work and materials involved in dredging up to 55 ft of soft mud and constructing, mostly below sea level, 1 1/4 mi long and 125 ft high main dam and two subsidiary dams are outlined; mention is made of several significant changes in dam designs, arising from conditions encountered during construction period or to suit contractor's proposals; special problems which arose solely or mainly from construction under water; some 50 special investigations and studies were carried out in connection with these problems and main conclusions are listed.
Construction of Plover Cove Dams
Work and materials involved in dredging up to 55 ft of soft mud and constructing, mostly below sea level, 1 1/4 mi long and 125 ft high main dam and two subsidiary dams are outlined; mention is made of several significant changes in dam designs, arising from conditions encountered during construction period or to suit contractor's proposals; special problems which arose solely or mainly from construction under water; some 50 special investigations and studies were carried out in connection with these problems and main conclusions are listed.
Construction of Plover Cove Dams
Int Congress on Large Dams
Elliott, S.G. (author) / Ford, S.E.H. (author) / Oules, J. (author)
9th International Congress on Large Dams ; 1967 ; Turkey , Istanbul
1967
26 pages
Conference paper
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Plover cove water scheme, Hong Kong
Engineering Index Backfile | 1963
Wiley | 2006
|British Library Online Contents | 2006
|PIPING PLOVER POPULATION CHANGES IN SASKATCHEWAN
British Library Conference Proceedings | 2004
|