A platform for research: civil engineering, architecture and urbanism
Describes means and methods employed for meeting unexpected difficulties in placing the foundations, arising from inability to keep the excavation clear of water. A final resort to sheet piling enabled the excavation to be completed and the foundation was built upon bearing piles. (1000 w.)
Describes means and methods employed for meeting unexpected difficulties in placing the foundations, arising from inability to keep the excavation clear of water. A final resort to sheet piling enabled the excavation to be completed and the foundation was built upon bearing piles. (1000 w.)
Foundations for a power house
Engineers' Year Book, Univ Minn
Loy, George J. (author)
1896
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1947
|Pumped concrete for power house foundations
Engineering Index Backfile | 1935
|Dewatering of foundations at Pathri power house
Engineering Index Backfile | 1954
|The foundations of a large power house
Engineering Index Backfile | 1899
Interlocking metal piling for power house foundations
Engineering Index Backfile | 1903