A platform for research: civil engineering, architecture and urbanism
Movers help builder save month with 3-hour shoring shift
Falsework and forms for twin traffic tunnels over U S 99 near Gavin Canyon, Calif, topped with forms for new highway bridges of Interstate 5 were moved intact from one bridge site to another; assembly was moved by winch trucks over timber covered, 6-in. high, concrete ramps; to carry precast panels for triple 12×12 ft 600 ft long culvert, space frame with lifting arrangement was constructed on flat bed truck.
Movers help builder save month with 3-hour shoring shift
Falsework and forms for twin traffic tunnels over U S 99 near Gavin Canyon, Calif, topped with forms for new highway bridges of Interstate 5 were moved intact from one bridge site to another; assembly was moved by winch trucks over timber covered, 6-in. high, concrete ramps; to carry precast panels for triple 12×12 ft 600 ft long culvert, space frame with lifting arrangement was constructed on flat bed truck.
Movers help builder save month with 3-hour shoring shift
Construction Method Equipment
1966
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1935
|Online Contents | 1998
Springer Verlag | 2022
|SHORING SYSTEM, BEAM ASSEMBLY FOR A SHORING SYSTEM, AND SHORING SYSTEM COMPONENTS
European Patent Office | 2023
|