A platform for research: civil engineering, architecture and urbanism
Moving of church building in Warsaw (Poland)
Moving brick building weighing 6800 ton required special precautions due to lack of structural framework and to large and dangerous cracks caused by war actions; description of extensive reinforcement of whole structure prior to undercutting, construction of supporting steel grid and rollway, moving operation, and tensometric as well as geodetic measurements performed during and after moving; 21 m long path was covered in 227 min, at average speed of 6 cm/min and maximum speed of 14 cm/min.
Moving of church building in Warsaw (Poland)
Moving brick building weighing 6800 ton required special precautions due to lack of structural framework and to large and dangerous cracks caused by war actions; description of extensive reinforcement of whole structure prior to undercutting, construction of supporting steel grid and rollway, moving operation, and tensometric as well as geodetic measurements performed during and after moving; 21 m long path was covered in 227 min, at average speed of 6 cm/min and maximum speed of 14 cm/min.
Moving of church building in Warsaw (Poland)
Die Verschiebung einer Kirche in Warschau
Hojarczyk, S. (author)
Bautechnik ; 44
1967
5 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
National Stadium Warsaw, Poland
British Library Online Contents | 2013
|National Stadium Warsaw, Poland
Online Contents | 2013
|Prudential house in Warsaw (Poland)
Engineering Index Backfile | 1934
|Czajka Sewage Plant, Warsaw, Poland
British Library Online Contents | 2010
|Prudential house in Warsaw (Poland)
Engineering Index Backfile | 1934
|