A platform for research: civil engineering, architecture and urbanism
Skal'nye raboty na stroitel'stve Chirkeiskoi ges
Rock excavation at construction of Chirkey hydro plant; special services must be set up for observation of rock slopes along steep roads in cuts; all rock excavation should be performed by presplit blasting for any height over 6 to 8 m; rock slopes should be prepared by water monitor jets under pressure of 8 to 12 atm for future concreting jobs.
Skal'nye raboty na stroitel'stve Chirkeiskoi ges
Rock excavation at construction of Chirkey hydro plant; special services must be set up for observation of rock slopes along steep roads in cuts; all rock excavation should be performed by presplit blasting for any height over 6 to 8 m; rock slopes should be prepared by water monitor jets under pressure of 8 to 12 atm for future concreting jobs.
Skal'nye raboty na stroitel'stve Chirkeiskoi ges
Skal'nye raboty na stroitel'stve Chirkeiskoi ges
Erakhtin, B.M. (author)
1967
6 pages
Article (Journal)
Russian
© Metadata Copyright Elsevier B. V. All rights reserved.
Montažnye raboty v stroitel'stve
TIBKAT | 1.1967 - 16.1975
|Montažnye i special'nye raboty v stroitel'stve
TIBKAT | 26.1964 - 33.1971; 1972 -
Montažnye i specializirovannye raboty v stroitel'stve
TIBKAT | 22.1960,2 - 25.1963
Protivokorrozionnye raboty v stroitel'stve : naučno-techničeskij referativnyj sbornik
TIBKAT | Nachgewiesen 1980 - 1982,6; damit Ersch. eingest.
TIBKAT | 1.1966 - 5.1971[?]