A platform for research: civil engineering, architecture and urbanism
Step-by-step analysis of installation and time involved in pulling two 330-ft primary feeders from basement to transformer load-center in roof mechanical room, to supply power for upper floors of apartment building.
Step-by-step analysis of installation and time involved in pulling two 330-ft primary feeders from basement to transformer load-center in roof mechanical room, to supply power for upper floors of apartment building.
Pulling high-voltage risers
Elec Construction Maintenance
McPartland, J.F. (author)
1966
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
DEEPWATER RISERS - Steel catenary versus flexible risers
Online Contents | 1996
Springer Verlag | 2021
|Low-voltage direct electrical heating LVDEH flexible pipes risers
European Patent Office | 2016
|