A platform for research: civil engineering, architecture and urbanism
Handsome concrete bridge completed at Belleville
Two-span bow-string structure, 220 ft. long overall, completed in less than four months; splash panel is novel feature of design.
Handsome concrete bridge completed at Belleville
Two-span bow-string structure, 220 ft. long overall, completed in less than four months; splash panel is novel feature of design.
Handsome concrete bridge completed at Belleville
Contract Rec
Mott, C.A. (author)
1930
2 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1995
|TIBKAT | 1988
|Online Contents | 1989
|A concrete arch of 40-ft. Span at Belleville
Engineering Index Backfile | 1896
World's largest precast prestressed concrete bridge completed
Engineering Index Backfile | 1959