A platform for research: civil engineering, architecture and urbanism
Preferable design involves use of 3-in. brick with no lugs on a sand cushion not over 1 in. deep and jointed with refined asphalt applied by squeegee method.
Preferable design involves use of 3-in. brick with no lugs on a sand cushion not over 1 in. deep and jointed with refined asphalt applied by squeegee method.
How brick pavements should be built
Contract Rec
Perkins, Wm.C. (author)
1925
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1892
Engineering Index Backfile | 1893
Engineering Index Backfile | 1890
|Engineering Index Backfile | 1893
Engineering Index Backfile | 1903
|