A platform for research: civil engineering, architecture and urbanism
Methods used in construction of 3 diversion tunnels with total length of 7640 ft for Peace River Dam project in British Columbia, Canada; instrumentation and materials used; problems of water insulation to cope with extreme winter conditions.
Methods used in construction of 3 diversion tunnels with total length of 7640 ft for Peace River Dam project in British Columbia, Canada; instrumentation and materials used; problems of water insulation to cope with extreme winter conditions.
Assault on Peace
Roads Eng Construction
Petersen, E.V. (author)
1962
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1996
Editorial: Assault on the everyday
Taylor & Francis Verlag | 2019
|