A platform for research: civil engineering, architecture and urbanism
Single, deterministic time values associated with one cost figure in activity-oriented system are studied for applications of network planning technique; maximum benefits from these techniques can be obtained through re-working schedule, alternate plans, and repeated updatings; computers are suggested for projects.
Single, deterministic time values associated with one cost figure in activity-oriented system are studied for applications of network planning technique; maximum benefits from these techniques can be obtained through re-working schedule, alternate plans, and repeated updatings; computers are suggested for projects.
Use of critical path techniques
ASCE -- Proc (J Structural Div)
Zahler, C.W. (author)
1963
10 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Manual Critical Path Techniques for construction
TIBKAT | 1965
|Engineering Index Backfile | 1964
|Engineering Index Backfile | 1964
|TIBKAT | 1971
|British Library Online Contents | 2007