A platform for research: civil engineering, architecture and urbanism
Construction of two concrete lined water tunnels of Gila reclamation project in Arizona, having horseshoe section 20 ft in diam and respective lengths of 1740 ft and 425 ft.
Construction of two concrete lined water tunnels of Gila reclamation project in Arizona, having horseshoe section 20 ft in diam and respective lengths of 1740 ft and 425 ft.
Tunnel construction, gravity main canal
Reclamation Era
Blout, E.A. (author)
Reclamation Era ; 29
1939
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Inverted siphons, gravity main canal
Engineering Index Backfile | 1940
|Storm drainage structures, Gila Gravity Main Canal
Engineering Index Backfile | 1941
|Pumping plant No. 1 gravity Main Canal Dila project, Arizona
Engineering Index Backfile | 1940
Wellton-Mohawk check and turnout station 790 + 90.17 gravity main canal
Engineering Index Backfile | 1940