A platform for research: civil engineering, architecture and urbanism
Reconstructs failed ore dock wall at Cleveland
Features of project undertaken by Pennsylvania Railroad at Cleveland, Ohio, where H-section bearing piles up to 91.5 ft long were used in rebuilding structure formerly supported by concrete piles.
Reconstructs failed ore dock wall at Cleveland
Features of project undertaken by Pennsylvania Railroad at Cleveland, Ohio, where H-section bearing piles up to 91.5 ft long were used in rebuilding structure formerly supported by concrete piles.
Reconstructs failed ore dock wall at Cleveland
Ry Age
Railway Age ; 106
1939
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
China resists and reconstructs
Engineering Index Backfile | 1939
|B. and O. reconstructs 63 bridges
Engineering Index Backfile | 1930
|Phoenix reconstructs its sky harbor airport
Engineering Index Backfile | 1949
|After 60 Years, County Reconstructs a Small Dam
Online Contents | 1998
|