A platform for research: civil engineering, architecture and urbanism
Discussion of momentary run-off peaks entirely out of proportion to rate of rainfall, with special reference to January 1 1934 flood near Los Angeles; controlling factors; duration of flood peaks.
Discussion of momentary run-off peaks entirely out of proportion to rate of rainfall, with special reference to January 1 1934 flood near Los Angeles; controlling factors; duration of flood peaks.
Transient flood peaks
Am Soc Civ Engrs -- Proc
Lynch, H.B. (author)
1939
20 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
ASCE | 2021
|Engineering Index Backfile | 1940
|Discussion of “Houk on Transient Flood Peaks”
ASCE | 2021
|Closure to “Lynch on Transient Flood Peaks”
ASCE | 2021
|Rational method for estimating flood peaks
Engineering Index Backfile | 1957
|