A platform for research: civil engineering, architecture and urbanism
Inner graving dock, Colombo Harbour
Illustrated description of construction of dock 350 ft long; for concreting of walls 7 to 1 mass concrete was used; faced with precast block work to form steps and broad altars at levels; excavation and concreting carried out with assistance of six 2 1/2-ton to 3-ton locomotive cranes. (see also French abstract in Genie Civil v 115 n 2977 Sept 2 1939 p 200-2)
Inner graving dock, Colombo Harbour
Illustrated description of construction of dock 350 ft long; for concreting of walls 7 to 1 mass concrete was used; faced with precast block work to form steps and broad altars at levels; excavation and concreting carried out with assistance of six 2 1/2-ton to 3-ton locomotive cranes. (see also French abstract in Genie Civil v 115 n 2977 Sept 2 1939 p 200-2)
Inner graving dock, Colombo Harbour
Engineering
Engineering ; 147
1939
3 pages
Supp plate
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Inner graving dock, Colombo Harbour
Engineering Index Backfile | 1939
Engineering Index Backfile | 1942
Engineering Index Backfile | 1945
Closure on Nagasaki Graving Dock
ASCE | 2021
|Discussion on Nagasaki Graving Dock
ASCE | 2021
|