A platform for research: civil engineering, architecture and urbanism
Tower chutes distribute concrete to thin arch dams in narrow canyon
Arrangement of concreting plant for construction of two thin concrete arch dams for Pinnacles hydroelectric development of Danville, Va; mast hoist and tubular elevator tower distribute concrete over length of 575 ft; dam forms for use on successive lifts are designed in panels 40 ft long by 8 ft 4 in. high.
Tower chutes distribute concrete to thin arch dams in narrow canyon
Arrangement of concreting plant for construction of two thin concrete arch dams for Pinnacles hydroelectric development of Danville, Va; mast hoist and tubular elevator tower distribute concrete over length of 575 ft; dam forms for use on successive lifts are designed in panels 40 ft long by 8 ft 4 in. high.
Tower chutes distribute concrete to thin arch dams in narrow canyon
Construction Methods Equipment
1939
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building a high concrete arch dam in a narrow canyon
Engineering Index Backfile | 1927
Arch dams: economy of concrete dams
Engineering Index Backfile | 1957
|Engineering Index Backfile | 1928
|