A platform for research: civil engineering, architecture and urbanism
Four cofferdams for forty-one foundations
Outline of floating cofferdam method employed in building foundations of Storstrom bridge in Denmark; two pairs of floating coffers served all 41 foundations; when operations were fully organized cofferdam was sunk, foundation was built and cofferdam was floated again in about 20 days; pier shaft construction.
Four cofferdams for forty-one foundations
Outline of floating cofferdam method employed in building foundations of Storstrom bridge in Denmark; two pairs of floating coffers served all 41 foundations; when operations were fully organized cofferdam was sunk, foundation was built and cofferdam was floated again in about 20 days; pier shaft construction.
Four cofferdams for forty-one foundations
Eng News-Rec
Koefoed, S.M. (author)
Engineering News-Record ; 123
1939
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1962
|UB Braunschweig | 1940
|Engineering Index Backfile | 1936
|Engineering Index Backfile | 1940
Engineering Index Backfile | 1950