A platform for research: civil engineering, architecture and urbanism
Snake River lift bridge links Washington-Idaho
Description of new steel truss highway bridge over Snake River at Lewiston, Idaho, having total length of 1423 ft and comprising 200-ft vertical lift span flanked on each side by 150-ft span built integral with counterweight towers; counterweight cable adjustment by special hydraulic jack device; architectural treatment; cost estimates.
Snake River lift bridge links Washington-Idaho
Description of new steel truss highway bridge over Snake River at Lewiston, Idaho, having total length of 1423 ft and comprising 200-ft vertical lift span flanked on each side by 150-ft span built integral with counterweight towers; counterweight cable adjustment by special hydraulic jack device; architectural treatment; cost estimates.
Snake River lift bridge links Washington-Idaho
Western Construction News
Finke, R.W. (author)
1939
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Ice Jam Analysis at Idaho Falls, Snake River, Idaho
NTIS | 1990
|Gold dredging on Snake river in Idaho
Engineering Index Backfile | 1900
|