A platform for research: civil engineering, architecture and urbanism
Paris-neuilly welded bridge
Scheme provided for deep architectural span of reinforced concrete over island, and spans built up of welded steel sheet over two arms of river; total length 834 ft; width between balustrades 114 ft 9 in.; steel construction over arms of river with spans of 219 ft 9 in. and 269 ft, is entirely of welded steel plate having tensile strength of 34 tons per sq in. (See also Metal Progress v 36 n 3 Sept 1939 p 242 and 310)
Paris-neuilly welded bridge
Scheme provided for deep architectural span of reinforced concrete over island, and spans built up of welded steel sheet over two arms of river; total length 834 ft; width between balustrades 114 ft 9 in.; steel construction over arms of river with spans of 219 ft 9 in. and 269 ft, is entirely of welded steel plate having tensile strength of 34 tons per sq in. (See also Metal Progress v 36 n 3 Sept 1939 p 242 and 310)
Paris-neuilly welded bridge
Engineer
Engineer ; 168
1939
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1946
Engineering Index Backfile | 1945
River underpass at Neuilly Bridge
Engineering Index Backfile | 1963
Concrete lined vehicular tunnels of Neuilly and Champerret, Paris
Engineering Index Backfile | 1936
|