A platform for research: civil engineering, architecture and urbanism
Design and construction of Adolf Hitler reinforced concrete highway bridge over Zwickauer Mulde at Aue, Germany, consisting of 10 spans totaling 308 m in length
Methods of prestressing of main reinforcement of girders; cost 920,000 reichmarks.
Design and construction of Adolf Hitler reinforced concrete highway bridge over Zwickauer Mulde at Aue, Germany, consisting of 10 spans totaling 308 m in length
Methods of prestressing of main reinforcement of girders; cost 920,000 reichmarks.
Design and construction of Adolf Hitler reinforced concrete highway bridge over Zwickauer Mulde at Aue, Germany, consisting of 10 spans totaling 308 m in length
Die Adolf-Hitler-bruecke in aue
Schoenberg, M. (author) / Fichtner, F. (author)
Bautechnik ; 17
1939
8 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
|Modellierung der Zwickauer Mulde –‐Verhaltensmodelle
Wiley | 1981
|Modellierung der Zwickauer Mulde ‐ Beschreibungsmodelle
Wiley | 1980
|