A platform for research: civil engineering, architecture and urbanism
Design and construction of 2-span cellular reinforced concrete continuous bridge, 125 ft long, forming part of New Jersey approach to Lincoln Tunnel; construction of centering for cell; longitudinal shear and diagonal tension; details of hinges; arrangement of reinforcement.
Design and construction of 2-span cellular reinforced concrete continuous bridge, 125 ft long, forming part of New Jersey approach to Lincoln Tunnel; construction of centering for cell; longitudinal shear and diagonal tension; details of hinges; arrangement of reinforcement.
Summit avenue bridge
Civ Eng (NY)
Dunham, C.W. (author)
1939
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2017
|Online Contents | 2017
|Connecticut Avenue bridge, Washington
Engineering Index Backfile | 1904
British Library Online Contents | 2000
Strachan Avenue bridge, Toronto
Engineering Index Backfile | 1916
|