A platform for research: civil engineering, architecture and urbanism
New and unusual upper deck for Chicago's Michigan Ave. Bridge
Construction of new wearing surface for floor of old bascule bridge, consisting of asphalt plank laid on timber subflooring, except at end zones, where novel cast iron grid filled with concrete is used because of excessive wear.
New and unusual upper deck for Chicago's Michigan Ave. Bridge
Construction of new wearing surface for floor of old bascule bridge, consisting of asphalt plank laid on timber subflooring, except at end zones, where novel cast iron grid filled with concrete is used because of excessive wear.
New and unusual upper deck for Chicago's Michigan Ave. Bridge
Eng News-Rec
Engineering News-Record ; 123
1939
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Lake Michigan Pollution and Chicago's Supply
Wiley | 1965
|A description of Chicago's double-deck downtown boulevard
Engineering Index Backfile | 1927
Chicago's First Tied-Arch Bridge
British Library Online Contents | 2014
|Chicago’s First Tied-Arch Bridge
ASCE | 2013
|