A platform for research: civil engineering, architecture and urbanism
Construction methods on the salt springs rock-fill dam in California
Dam, 328 ft. high, having crest length of 1300 ft.; more than 3,000, 000 cu. yd. fill of quarried rock placed at rate of 125,000 cu. yd. per month; upstream slope paved with 15-ft. layer of placed rock surfaced with concrete slab; quarrying and placing rock-fill; constructing concrete facing slab and placed rock facing.
Construction methods on the salt springs rock-fill dam in California
Dam, 328 ft. high, having crest length of 1300 ft.; more than 3,000, 000 cu. yd. fill of quarried rock placed at rate of 125,000 cu. yd. per month; upstream slope paved with 15-ft. layer of placed rock surfaced with concrete slab; quarrying and placing rock-fill; constructing concrete facing slab and placed rock facing.
Construction methods on the salt springs rock-fill dam in California
Eng News-Rec
Engineering News-Record ; 105
1930
4 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
Work in progress at salt springs -- Placing rock-fill in big dam
Engineering Index Backfile | 1928
Construction of the Morena rock fill dam, San Diego County, California
Engineering Index Backfile | 1911
|Construction of the Morena rock fill dam, San Diego county, California
Engineering Index Backfile | 1912
Construction of the Morena rock fill dam, San Diego county, California
Engineering Index Backfile | 1912