A platform for research: civil engineering, architecture and urbanism
Break repaired at saluda dam
Gap left by slide in 11,000,000-yd. embankment closed by new earth fill; core material compacted in thin layers by rolling thoroughly after being spread dry with tractors equipped with bulldozers.
Break repaired at saluda dam
Gap left by slide in 11,000,000-yd. embankment closed by new earth fill; core material compacted in thin layers by rolling thoroughly after being spread dry with tractors equipped with bulldozers.
Break repaired at saluda dam
Construction Methods
Construction Methods ; 12
1930
3 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2002
|Engineering Index Backfile | 1931
|Building the mammoth saluda dam
Engineering Index Backfile | 1930
|Foundation treatment for Saluda Dam
British Library Conference Proceedings | 2006
|Saluda Dam Remediation RCC Mix Design Program
British Library Conference Proceedings | 2003
|