A platform for research: civil engineering, architecture and urbanism
Features of spillway dam for Rochester Gas and Electric Corporation's proposed hydroelectric project on Genesee River; dam will be straight, gravity, concrete structure; 1090 ft. long at top and its maximum height will be 230 ft. above foundation; dam is designed to pass peak flood of 100,000 cu. ft. per sec.; over 400 ft. spillway section; method of testing of 1:16 scale spillway model in laboratory.
Features of spillway dam for Rochester Gas and Electric Corporation's proposed hydroelectric project on Genesee River; dam will be straight, gravity, concrete structure; 1090 ft. long at top and its maximum height will be 230 ft. above foundation; dam is designed to pass peak flood of 100,000 cu. ft. per sec.; over 400 ft. spillway section; method of testing of 1:16 scale spillway model in laboratory.
The Mount Morris dam
Cornell Civil Engr
Cooman, C.C. (author)
1930
2 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Mount Morris Township Housing Study
NTIS | 1970
Concrete production and control at Mount Morris dam
Engineering Index Backfile | 1949
Radio-direct trucks supplying aggregate stone to mount morris dam
Engineering Index Backfile | 1949
Construction plant at Mount Morris dam organized to meet rigid specifications
Engineering Index Backfile | 1950
|