A platform for research: civil engineering, architecture and urbanism
Placing and protecting concrete in winter
Construction operations on Boule dam at Hastings, Minn., carried on with temperature ranging as low as 2 deg. below zero fahr.
Placing and protecting concrete in winter
Construction operations on Boule dam at Hastings, Minn., carried on with temperature ranging as low as 2 deg. below zero fahr.
Placing and protecting concrete in winter
Military Engr
Christenson, E.J. (author)
Military Engineer ; 22
1930
4 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Report on placing concrete in winter
Engineering Index Backfile | 1924
Placing Winter Concrete: Pearl Harbor Memorial Bridge
ASCE | 2014
|Placing Winter Concrete: Pearl Harbor Memorial Bridge
Online Contents | 2015
|