A platform for research: civil engineering, architecture and urbanism
Concrete control saves cement, yields high strengths and speeds work
Contractor on 48-story Carew Tower, Cincinnati's largest and tallest building, proves economy of careful design in placing of foundation and floor concrete; "probable variation" as measure of uniformity of strength obtained; maintenance of workability of concrete; savings in cement, time and formwork which were made possible by design and control of concrete.
Concrete control saves cement, yields high strengths and speeds work
Contractor on 48-story Carew Tower, Cincinnati's largest and tallest building, proves economy of careful design in placing of foundation and floor concrete; "probable variation" as measure of uniformity of strength obtained; maintenance of workability of concrete; savings in cement, time and formwork which were made possible by design and control of concrete.
Concrete control saves cement, yields high strengths and speeds work
Eng. News-Rec
Hagy, E.A. (author) / Kennedy, C.T. (author)
Engineering News-Record ; 105
1930
3 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Strengths of Cement Kiln Dust Concrete
Online Contents | 2002
|Strengths of Cement Kiln Dust Concrete
British Library Online Contents | 2002
|Soil cement saves street system
Engineering Index Backfile | 1952
|Engineering Index Backfile | 1930
Contractor saves 30 per cent cement through quality control
Engineering Index Backfile | 1928
|