A platform for research: civil engineering, architecture and urbanism
Nearly five thousand dollars saved on one contract by use of bulk cement
Handling of cement in construction of Lebanon-Pottsville highway, 6. 67 mi. in length; cement is shipped in ordinary box cars and is unloaded by Fuller Kinyon cement unloader; advantages of use of bulk cement.
Nearly five thousand dollars saved on one contract by use of bulk cement
Handling of cement in construction of Lebanon-Pottsville highway, 6. 67 mi. in length; cement is shipped in ordinary box cars and is unloaded by Fuller Kinyon cement unloader; advantages of use of bulk cement.
Nearly five thousand dollars saved on one contract by use of bulk cement
Pub. Works
Ambler, J.P. (author)
Public Works ; 61
1930
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
|A public library, to cost one hundred thousand dollars
Engineering Index Backfile | 1899
|Temporary hypo-chlorinator for five dollars
Engineering Index Backfile | 1944
|Five London housing schemes saved by the HCA
Online Contents | 2009
Five London housing schemes saved by the HCA
British Library Online Contents | 2009