A platform for research: civil engineering, architecture and urbanism
Winter concreting methods applied on contract of moderate size
Report on winter construction of four-story Y. M. C. A. Building in Kenosha, Wisconsin, 120 ft. by 150 ft.; wall-bearing construction prolonged concreting period; frequent tests made; winter concrete plant equipment; coal and coke consumption of boiler and salamanders; cost of winter concreting.
Winter concreting methods applied on contract of moderate size
Report on winter construction of four-story Y. M. C. A. Building in Kenosha, Wisconsin, 120 ft. by 150 ft.; wall-bearing construction prolonged concreting period; frequent tests made; winter concrete plant equipment; coal and coke consumption of boiler and salamanders; cost of winter concreting.
Winter concreting methods applied on contract of moderate size
Concrete
Johnson, R.C. (author)
Concrete ; 37
1930
4 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1937
|Online Contents | 1986
Engineering Index Backfile | 1967