A platform for research: civil engineering, architecture and urbanism
Investigation of cold-drawn bridge wire
Wire was used for Detroit River Bridge with span of 1850 ft. and Mount Hope Bridge 1200 ft. span; contractor for these bridges, McClintic-Marshall Co., organized series of tests of wire; tests were made at Lehigh University. (See also - discussion p 348-349)
Investigation of cold-drawn bridge wire
Wire was used for Detroit River Bridge with span of 1850 ft. and Mount Hope Bridge 1200 ft. span; contractor for these bridges, McClintic-Marshall Co., organized series of tests of wire; tests were made at Lehigh University. (See also - discussion p 348-349)
Investigation of cold-drawn bridge wire
Am. Soc. Testing Matls. -- Proc
Moisseiff, L.S. (author)
1930
35 pages
15 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1953
|Effectiveness of using cold drawn wire
Engineering Index Backfile | 1960
|Effectiveness of using cold drawn wire
Engineering Index Backfile | 1960
|Crystallization behavior in severely cold-drawn Ti50Ni47Fe3 wire
British Library Online Contents | 2014
|Investigation on cold-drawn gold bonding wire with serial and reverse-direction drawing
British Library Online Contents | 2006
|