A platform for research: civil engineering, architecture and urbanism
Steel-and-concrete bridge, 860 ft. long, recently constructed to avoid steep grades on Bayview Avenue and open up residential district, is carried on concrete towers and includes 125 ft. of concrete approach; total cost $220,000; spans vary from 98 ft. to 140 ft.
Steel-and-concrete bridge, 860 ft. long, recently constructed to avoid steep grades on Bayview Avenue and open up residential district, is carried on concrete towers and includes 125 ft. of concrete approach; total cost $220,000; spans vary from 98 ft. to 140 ft.
Bridge at Bayview heights, Toronto
Can. Engr
Babcock, H.A. (author)
Canadian Engineer ; 57
1929
3 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bayview, the Neighborhood Plan
NTIS | 1971
Bayview-Hunter's Point Urban Design Study
NTIS | 1971
SNAPSHOT: BAYVIEW RISE - By David Sokol
Online Contents | 2014