A platform for research: civil engineering, architecture and urbanism
Southern pacific company's Suisun bay bridge
Double-track railroad bridge designed to take place of train ferry across Carquinez Straits between Benicia and Port Costa; length of bridge between abutments 5603.5 ft.; one 328 ft. vertical lift span provides clearance of 135 ft. above mean higher high water; discussion. Miscellaneous construction details, by N. F. Helmers. (see also Ry. Age, vol. 88, no. 25, June 21, 1930, pp. 1458-1464, 11 figs)
Southern pacific company's Suisun bay bridge
Double-track railroad bridge designed to take place of train ferry across Carquinez Straits between Benicia and Port Costa; length of bridge between abutments 5603.5 ft.; one 328 ft. vertical lift span provides clearance of 135 ft. above mean higher high water; discussion. Miscellaneous construction details, by N. F. Helmers. (see also Ry. Age, vol. 88, no. 25, June 21, 1930, pp. 1458-1464, 11 figs)
Southern pacific company's Suisun bay bridge
Am. Soc. Civil Engrs. -- Proc
Kirkbride, W.H. (author)
1930
11 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Southern pacific company's Suisun bay bridge
Engineering Index Backfile | 1930
|Suisun bay bridge for Southern Pacific Co
Engineering Index Backfile | 1930
|Suisun bay bridge for Southern Pacific Co
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1929
Martinez-benicia bridge, Suisun bay
Engineering Index Backfile | 1931