A platform for research: civil engineering, architecture and urbanism
Fabrication and erection of superstructure of Montreal south shore bridge
Detailed report on construction of steel bridge, having total length of 8817 ft. exclusive of approaches, and comprising symmetrical cantilever span 1937 ft. long; secondary steel-truss spans vary from 96 to 249 ft. in length; general alignment of bridge is not straight; details of construction equipment. (See also Eng. Jl vol. 13, no. 5, May 1930 pp. 323-327, 2 figs)
Fabrication and erection of superstructure of Montreal south shore bridge
Detailed report on construction of steel bridge, having total length of 8817 ft. exclusive of approaches, and comprising symmetrical cantilever span 1937 ft. long; secondary steel-truss spans vary from 96 to 249 ft. in length; general alignment of bridge is not straight; details of construction equipment. (See also Eng. Jl vol. 13, no. 5, May 1930 pp. 323-327, 2 figs)
Fabrication and erection of superstructure of Montreal south shore bridge
Eng. Contracting
Wilson, L.R. (author)
1930
7 pages
11 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Fabrication and erection of superstructure of Montreal south shore bridge
Engineering Index Backfile | 1930
|The Montreal-south shore bridge
Engineering Index Backfile | 1926
Montreal harbor bridge superstructure
Engineering Index Backfile | 1930
The erection of the Thebes bridge superstructure
Engineering Index Backfile | 1905
The Oeresund Bridge, Erection of the Superstructure
British Library Conference Proceedings | 1998
|