A platform for research: civil engineering, architecture and urbanism
The replacement of a railway bridge at Liverpool
Replacement of bridge of Cheshire Lines Committee over Walton Hall avenue, Liverpool; new bridge is through girder span, having length of 148 ft. 6 in. width of 31 ft. 6 in., and depth of girder of 23 ft.: in order to interfere with traffic as little as possible, bridge was erected parallel with existing bridge, on trestles extended sufficiently to one side for new span to be rolled sideways into position.
The replacement of a railway bridge at Liverpool
Replacement of bridge of Cheshire Lines Committee over Walton Hall avenue, Liverpool; new bridge is through girder span, having length of 148 ft. 6 in. width of 31 ft. 6 in., and depth of girder of 23 ft.: in order to interfere with traffic as little as possible, bridge was erected parallel with existing bridge, on trestles extended sufficiently to one side for new span to be rolled sideways into position.
The replacement of a railway bridge at Liverpool
Engineering
Engineering ; 129
1930
4 Figs. on Supp. plate
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Birmingham and Liverpool railway
TIBKAT | 1825
Birmingham and Liverpool railway
UB Braunschweig | 1825
The Liverpool and Southport railway
Engineering Index Backfile | 1904
|The quick replacement of a railway bridge
Engineering Index Backfile | 1930
Rapid Replacement of a Movable Steel Railway Bridge
British Library Online Contents | 2006
|