A platform for research: civil engineering, architecture and urbanism
Winter construction of concrete bridges on Ohio river boulevard
Winter expedients and use of high-early-strength cement enable $5,000,000 boulevard with nine bridges, in Allegheny County, to be completed 220 days ahead of scheduled date; forms and centering for arch ribs and spandrel columns; winter costs and savings.
Winter construction of concrete bridges on Ohio river boulevard
Winter expedients and use of high-early-strength cement enable $5,000,000 boulevard with nine bridges, in Allegheny County, to be completed 220 days ahead of scheduled date; forms and centering for arch ribs and spandrel columns; winter costs and savings.
Winter construction of concrete bridges on Ohio river boulevard
Eng. News-Rec
Covell, V.R. (author) / Freeman, P.J. (author)
Engineering News-Record ; 105
1930
4 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building a modern brick Boulevard near Cleveland, Ohio
Engineering Index Backfile | 1931
|Boulevard construction in Pasadena
Engineering Index Backfile | 1928
|Concrete pavement construction and Winter construction of bridges
Engineering Index Backfile | 1957
Vom Boulevard Périphérique zum Boulevard Central?
Taylor & Francis Verlag | 2017
|Highway Boulevard construction in San Francisco
Engineering Index Backfile | 1929
|