A platform for research: civil engineering, architecture and urbanism
Features of Boulder Canyon project involving construction of concrete dam over 700 ft. high, to develop 1,250,000 hp., all-American canal to irrigate nearly million acres, etc.; total estimated cost is $165,000,000; operating reservoir; problems met in design; control of discharge; river control during construction; unusual field conditions surmounted; power development; financial expectations; fighting sand. (See also Civil Eng vol. 1, no. 1, Oct. 1930, pp. 3-8, 5 figs., and discussion in no. 3, Dec., pp. 204-205)
Features of Boulder Canyon project involving construction of concrete dam over 700 ft. high, to develop 1,250,000 hp., all-American canal to irrigate nearly million acres, etc.; total estimated cost is $165,000,000; operating reservoir; problems met in design; control of discharge; river control during construction; unusual field conditions surmounted; power development; financial expectations; fighting sand. (See also Civil Eng vol. 1, no. 1, Oct. 1930, pp. 3-8, 5 figs., and discussion in no. 3, Dec., pp. 204-205)
Hoover dam
Eng. Soc. Boston. -- Jl
Mead, E. (author)
1930
15 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
|Online Contents | 1994
Celebrating Hoover Dam: The Majesty of Hoover Dam
ASCE | 2016
|Engineering Index Backfile | 1931
Engineering Index Backfile | 1931
|