A platform for research: civil engineering, architecture and urbanism
Construction features and material handling in the New Orleans Municipal Auditorium
Methods of building auditorium which will measure 290 ft. wide and 320 ft. long, with annex 88 ft. wide and 320 ft. long; American tubular elevator used for handling concrete from mixers to buggies.
Construction features and material handling in the New Orleans Municipal Auditorium
Methods of building auditorium which will measure 290 ft. wide and 320 ft. long, with annex 88 ft. wide and 320 ft. long; American tubular elevator used for handling concrete from mixers to buggies.
Construction features and material handling in the New Orleans Municipal Auditorium
Contractors Engrs. Monthly
1929
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of new municipal auditorium at Winnipeg, Man.
Engineering Index Backfile | 1933
|Kansas City's municipal auditorium
Engineering Index Backfile | 1940
|Laminated timber arches support municipal auditorium roof
Engineering Index Backfile | 1937
Auditorium uses new type construction
Engineering Index Backfile | 1938
|