A platform for research: civil engineering, architecture and urbanism
The sawyer wall system
Description of a new hollow wall construction, built without use of wooden forms and consisting of two units, the main slab and locking (or key) slab, which are both shaped so that each dovetails into the other, in such manner, when placed in wall, that interlocking part of slabs forms space which is poured with grout (concrete) and locks wall together.
The sawyer wall system
Description of a new hollow wall construction, built without use of wooden forms and consisting of two units, the main slab and locking (or key) slab, which are both shaped so that each dovetails into the other, in such manner, when placed in wall, that interlocking part of slabs forms space which is poured with grout (concrete) and locks wall together.
The sawyer wall system
Contract Rec
1920
2 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1979
|Sawyer/Berson : houses and landscapes
TIBKAT | 2023
|Condition Survey, K. I. Sawyer Air Force Base, Michigan
NTIS | 1973
|Another year of progress - David Sawyer reports on NFRIP developments during 2008
Online Contents | 2009
|