A platform for research: civil engineering, architecture and urbanism
Bridge versus tunnel for the proposed hudson river crossing at New York City
Costs are estimated to be:(For highway bridge $32,500,000; for four highway tunnels $49,000,000; for electric-railway bridge, $34,500,000; for four double-track electric-railway tunnels, $48,000,000; and for eight single-track, electric-railway tunnels, $30,000,000.
Bridge versus tunnel for the proposed hudson river crossing at New York City
Costs are estimated to be:(For highway bridge $32,500,000; for four highway tunnels $49,000,000; for electric-railway bridge, $34,500,000; for four double-track electric-railway tunnels, $48,000,000; and for eight single-track, electric-railway tunnels, $30,000,000.
Bridge versus tunnel for the proposed hudson river crossing at New York City
Proc. Am. Soc. Civil Engrs
Waddell, J.A.L. (author)
1920
5 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Planning for Hudson River bridge at New York City
Engineering Index Backfile | 1921
The new proposed Hudson River bridge
Engineering Index Backfile | 1926
Proposed Kingston-Rhinecliff bridge over Hudson River
Engineering Index Backfile | 1948
|Proposed vehicular tunnel under the Hudson at New York
Engineering Index Backfile | 1919