A platform for research: civil engineering, architecture and urbanism
Concrete road construction methods on contract no. 8 of the Du Pont Highway, Delaware.
Construction of road for distance of six and one-half miles. Road is of 1course cement concrete, mixed in proportions of 1 part cement, 2 parts fine aggregate and 4 parts coarse aggregate, to which 10 per cent by volume of hydrated lime is added.
Concrete road construction methods on contract no. 8 of the Du Pont Highway, Delaware.
Construction of road for distance of six and one-half miles. Road is of 1course cement concrete, mixed in proportions of 1 part cement, 2 parts fine aggregate and 4 parts coarse aggregate, to which 10 per cent by volume of hydrated lime is added.
Concrete road construction methods on contract no. 8 of the Du Pont Highway, Delaware.
Eng. Contracting
Sherron, George, A. (author)
1920
3 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Coleman du Pont road across Delaware
Engineering Index Backfile | 1912
The Coleman du Pont highway through the state of Delaware
Engineering Index Backfile | 1912
Engineering Index Backfile | 1915
Construction work on du pont road
Engineering Index Backfile | 1917
Road and highway construction methods
Engineering Index Backfile | 1965
|