A platform for research: civil engineering, architecture and urbanism
Notes on railway construction in Uganda
How grades were reduced in section where difference in level is 7758 ft. and where ravines scoring sides of steep scarp could not be crossed by ordinary embankments.
Notes on railway construction in Uganda
How grades were reduced in section where difference in level is 7758 ft. and where ravines scoring sides of steep scarp could not be crossed by ordinary embankments.
Notes on railway construction in Uganda
Ry. Engr.
Railway Engineer ; 41
1920
8 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Western Uganda Railway Extension
Engineering Index Backfile | 1957
Notes on railway construction from the resident engineer's standpoint
Engineering Index Backfile | 1904
|Construction of Namawukulu Footbridge in Uganda
Springer Verlag | 2021
|Ethics In Construction: Examples from Uganda
British Library Conference Proceedings | 2007
|Some notes on piles and pile driving in railway construction
Engineering Index Backfile | 1911