A platform for research: civil engineering, architecture and urbanism
Operation and maintenance of the gunnison irrigation tunnel
Tunnel is 30,582 ft. long. Floor was lined throughout, and side walls and arch only where material was soft. Results of investigations made to determine value of coefficient n in Kutter's formula are included.
Operation and maintenance of the gunnison irrigation tunnel
Tunnel is 30,582 ft. long. Floor was lined throughout, and side walls and arch only where material was soft. Results of investigations made to determine value of coefficient n in Kutter's formula are included.
Operation and maintenance of the gunnison irrigation tunnel
Eng. Contracting
1920
2 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Gunnison tunnel of the Uncompahgre irrigation project
Engineering Index Backfile | 1906
|Engineering Index Backfile | 1906
A Channel for Life: Gunnison Tunnel
ASCE | 2016
|Gunnison Tunnel: Engineering History of an Early American Reclamation Project
Online Contents | 2013
|Gunnison Tunnel: Engineering History of an Early American Reclamation Project
Online Contents | 2013
|