A platform for research: civil engineering, architecture and urbanism
Silt disposal at Tacoma hydroelectric plant
Development consists of 50-ft. concrete dam diverting water across bend in river with 10,000ft. tunnel.
Silt disposal at Tacoma hydroelectric plant
Development consists of 50-ft. concrete dam diverting water across bend in river with 10,000ft. tunnel.
Silt disposal at Tacoma hydroelectric plant
Power
Llewellyn Evans (author)
Power ; 51
1920
4 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cushman hydroelectric project for Tacoma
Engineering Index Backfile | 1928
|Online Contents | 2006
British Library Conference Proceedings | 2001
|Advanced silt disposal technology offers cost savings
Tema Archive | 1997