A platform for research: civil engineering, architecture and urbanism
Particulars of two new piers, each 500 ft. long, a new fish-quay, 700 ft. long, and an improved entrance channel and general deepening of harbor up to swing bridge, depth of water provided throughout being 7 ft. at low water of ordinary spring tides.
Particulars of two new piers, each 500 ft. long, a new fish-quay, 700 ft. long, and an improved entrance channel and general deepening of harbor up to swing bridge, depth of water provided throughout being 7 ft. at low water of ordinary spring tides.
Whitby harbour extension works
Concrete Constructional Eng.
Mitchell, James (author)
1920
13 pages
13 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Dunkirk harbour extension works
Engineering Index Backfile | 1938
|Dunkirk harbour extension works
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1930
|