Report on cause and correction of foundation troubles of box factory at Natchez Mississippi
Following completion of plant, settlement occurred in foundations under practically all buildings and machinery. Trouble was found to be due to softening of top of 20 ft. of soil by water that could not escape through impervious blue clay under it. Correction was effected by excavating trenches through top soil to blue clay, installing porous tile and wood box drains and back-filling trenches to surface with cinders and gravel containing large percentage of sand.
Report on cause and correction of foundation troubles of box factory at Natchez Mississippi
Following completion of plant, settlement occurred in foundations under practically all buildings and machinery. Trouble was found to be due to softening of top of 20 ft. of soil by water that could not escape through impervious blue clay under it. Correction was effected by excavating trenches through top soil to blue clay, installing porous tile and wood box drains and back-filling trenches to surface with cinders and gravel containing large percentage of sand.
Report on cause and correction of foundation troubles of box factory at Natchez Mississippi
Proc. Am. Soc. Civil Engrs
Smith, C.E. (author)
1920
21 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Natchez Metropolitan Plan: Natchez, Mississippi
NTIS | 1972
|The Plan for Downtown Natchez, Mississippi
NTIS | 1973
|Natchez-Vidalia bridge on Mississippi river
Engineering Index Backfile | 1941
Automation Reduces Operating Costs for Natchez, Mississippi
British Library Conference Proceedings | 1998
|